Defence and armament subcontracting for machined components is a structurally significant opportunity for precision engineering workshops, but breaking into this sector requires careful preparation. Between sector-specific quality frameworks, regulatory approvals and comprehensive traceability requirements, the path is clearly defined — and navigable, provided you understand the underlying logic. This article covers the practical mechanisms: required certifications, regulatory obligations, critical materials and processes, and the concrete steps involved in qualifying a workshop with major prime contractors.

Why the defence sector demands specific machining standards

Machined parts for military applications — breeches, missile bodies, turret components, naval structural parts — operate in extreme environments and cannot sustain any in-service failure. This criticality translates into very tight geometric tolerances, often below one hundredth of a millimetre, alongside requirements for fatigue resistance, corrosion resistance and batch-to-batch repeatability.

Unlike civil aerospace, where programme lifecycles are long and predictable, the armament sector combines short production runs, strict confidentiality and national sovereignty imperatives. Prime contractors are not simply looking for a capable machining shop; they are looking for a partner who can document every step of production, flag any drift immediately and retain records over extended periods.

Essential certifications: EN 9100, AQAP and DGA approvals

EN 9100: the common aerospace and defence baseline

EN 9100 is the sector-specific equivalent of ISO 9001 for aerospace, space and defence. It adds requirements specific to product criticality: configuration management, first article inspection (FAI) management and supplier control throughout the entire supply chain. For a turning or precision milling workshop seeking to work with prime contractors such as Naval Group or Thales, EN 9100 certification is generally the minimum prerequisite. It is issued by accredited bodies (COFRAC in France) following a third-party audit.

AQAP 2110: the NATO requirement

AQAP 2110 (Allied Quality Assurance Publication) is the NATO quality framework applicable to design and manufacturing processes. Whereas EN 9100 remains sector-wide, AQAP 2110 is contractually mandated whenever a programme involves NATO member states or direct supply to the French armed forces. AQAP 2110 builds on ISO 9001 but adds formalised NATO oversight through a NATO Quality Assurance Representative. A subcontractor may hold EN 9100 certification without AQAP qualification, and vice versa: the two frameworks complement rather than replace each other.

DGA approvals: French government validation

The Direction générale de l'armement (DGA) operates its own supplier qualification system. Depending on the nature of the work — machining of small arms components, pyrotechnic parts, naval structural components — specific technical approvals may be required. These approvals involve audits conducted by DGA teams or bodies mandated by the DGA, covering not only the quality management system but also production equipment (machine tools, metrology, special processes) and personnel competencies. The time required to obtain initial qualifications can exceed twelve months.

Industrial security clearances and export controls (ITAR, French regulations)

Defence secret clearance

Certain contracts require the company to hold a defence secret clearance, issued by the Secrétariat général de la défense et de la sécurité nationale (SGDSN). This clearance relates to access to classified information and involves physical measures (secured premises, access control), IT measures (protected information systems) and individual vetting of cleared personnel. Company-level clearance is not sufficient on its own: each employee who handles classified information must be the subject of an individual administrative investigation.

ITAR and export controls

ITAR (International Traffic in Arms Regulations) is the US regulatory framework governing the export of defence materials and technologies. A French subcontractor machining parts that incorporate US-origin technologies, software or materials subject to ITAR must obtain a US export licence — including for transfers between French entities if the technology is controlled. Non-compliance exposes companies to severe extraterritorial penalties. On the French side, the dual-use goods regime (EU regulation) and the regulations governing war materials (CIEEMG — Commission interministérielle pour l'étude des exportations de matériels de guerre) also apply to such exchanges. Any workshop entering this supply chain should seek specialist legal advice as soon as an export dimension is possible.

Critical materials and processes in defence component machining

The range of materials encountered in defence machining is demanding: high-yield-strength steels (such as 35NiCrMo16), titanium alloys for lightweight structural parts, aerospace aluminium alloys, nickel-based superalloys for high-temperature environments, and occasionally metal matrix composites. Each material family requires specific cutting parameters and enhanced monitoring of surface integrity (residual stresses, work hardening).

Special processes — heat treatment, surface coating, welding — are subject to separate qualifications (under NADCAP standards for aerospace processes, or DGA frameworks for purely military applications). A workshop that outsources these processes retains responsibility for qualifying its special-process suppliers. Non-destructive testing (NDT) — dye penetrant, magnetic particle, ultrasonic, radiographic — is frequently specified for critical parts and must be carried out by COFREND-certified operators.

Quality control, traceability and documentation in the armament sector

Material traceability is total: every batch of raw material must be accompanied by its material certificate (EN 10204 type 3.1 or 3.2), physical segregation of batches must be maintained on the shop floor, and every non-conformance must be recorded and resolved through a formalised process. The manufacturing record — machining routings, dimensional inspection reports, acceptance reports — must be archived for contractually defined periods, sometimes exceeding twenty years for certain programmes.

The first article inspection (FAI) requires a full report documenting conformance of every dimensional, material and process characteristic before series production begins. This step is non-negotiable with virtually all defence prime contractors, whether MBDA, Nexter or any other weapons systems integrator.

How to enter the supply chain: from supplier qualification to the first contract

Assessing your starting point

Before taking any steps, an honest internal audit is essential: is the workshop ISO 9001 certified? Does it have calibrated and traceable metrology equipment (COFRAC)? Does its document management system support batch-to-batch traceability? These prerequisites determine the timeline and cost of the journey towards EN 9100 — the first concrete step towards the defence supply chain.

Planning for timescales and investment

Moving from ISO 9001 to EN 9100 typically requires between twelve and eighteen months of internal work, depending on the maturity of the existing quality management system. Obtaining a DGA approval can take longer. Investment focuses primarily on documentation, quality personnel training, and sometimes upgrades to metrology and inspection equipment. For a first certification, it is realistic to budget for support from a consultant experienced in aerospace and defence quality systems.

Getting listed

Once certifications are in place, the next step is registration in the supplier databases of major prime contractors (Airbus Defence, Naval Group, MBDA, Thales, and others). These databases typically require a detailed self-assessment questionnaire covering machine capabilities, materials handled, available processes and certifications currently in force. A precise and well-documented response to these questionnaires is critical to passing the initial screening.

Key bodies and networks for finding defence prime contractors

The GIFAS (Groupement des industries françaises aéronautiques et spatiales) brings together companies in the sector and serves as an institutional entry point for subcontractors seeking access to defence and aerospace programmes. The GICAT (Groupement des industries de défense et sécurité terrestres et aéroterrestres) plays an equivalent role for land armament, while the GICAN covers naval defence.

Regional competitiveness clusters are also active in facilitating introductions. Industrial areas historically associated with precision engineering — such as Lyon, Saint-Étienne, Annecy and Besançon — host active clusters and networks that connect prime contractors with SME machining shops. The Paris Air Show and Eurosatory are the key industry events for establishing qualified contacts.

Finally, the DGA regularly publishes its calls for applications and qualification frameworks on its dedicated portal, which is accessible to French companies wishing to submit a qualification file.

Frequently asked questions

Can an ISO 9001-certified workshop respond directly to a defence contract?

ISO 9001 alone is generally insufficient for defence contracts. Most prime contractors require at minimum EN 9100 and, depending on the programme, AQAP 2110 qualification or a DGA approval. ISO 9001 nonetheless provides a solid foundation that facilitates the transition to these more demanding frameworks.

What is the practical difference between EN 9100 and AQAP 2110?

EN 9100 is an aerospace, space and defence sector standard applicable across a broad range of civil and military prime contractors. AQAP 2110 is a NATO framework contractually imposed on government armament contracts involving member countries. The two frameworks are compatible but distinct: a workshop may be required to hold both, depending on the programmes it wishes to address.

Does ITAR apply to all French defence subcontractors?

No. ITAR applies whenever US-origin technologies, software, technical data or materials subject to the regulation are involved in manufacturing or development. A subcontractor working exclusively on 100% European programmes with no US component is not directly subject to ITAR, but should verify the nature of each programme before ruling out this possibility.

How long does it take for a company to obtain a defence secret clearance?

Timescales vary depending on the complexity of the file and the SGDSN's workload at the time of application. The process generally takes several months, and can exceed a year for higher-level clearances. This process must be initiated well in advance of any actual work involving classified information.

Does non-destructive testing have to be carried out in-house, or can it be subcontracted?

NDT can be subcontracted to a COFREND-certified laboratory, but the machining subcontractor retains responsibility for qualifying and monitoring that laboratory within its quality management system. Some prime contractors require NDT to be carried out by a laboratory they have themselves approved, which must be confirmed when reviewing the contractual requirements.